1997/06 to Current (27yr) President, Sultan Maintenance Planning Corp.

​

  • Asset Management / Maintenance Planning Consultant, enabling you to achieve reliability, regulatory compliance and efficiency.

  • Maintenance Planning / Scheduling, Reliability Analyst.

  • Extensive experience optimizing CMMS Systems for oil and gas facilities, pipelines, rotating equipment and maintenance programs with Bills of Materials.

  • Completed 6 Computerized Maintenance Management Systems (CMMS) implementations including:  SAP-PM and Maximo.

  • Cost effective Maintenance Tasks or Job Plans and Maintenance (PM) Programs for Rotating and fixed Mechanical Equipment

  • Strong ability to work within and manipulate large data sets

  • Above average proficiency with Microsoft Excel

  • Strong attention to detail

  • Ability to work with confidential data

​

2022/08 to 2024/05 (1.8yr) Contract Senior Master Data Analyst, ReVisionz Inc, Calgary, AB

​​

  • Capital Facilities Information Handover Specification (CFIHOS).
    Pembina Pipeline: Maintenance Significant Equipment Guideline.                                                                                                                              CFIHOS Conversion Table to Client SAP (ISO) Equipment Taxonomy Data.

  • Teck Resources - JDE / Maximo CMMS Conversion.
    High Valley Copper and Quebrada Blanca Phase 2 (QB2) Copper Mines.
    Mobile mine and copper processing equipment master data: hierarchy, location / asset classification, components, and failure codes.

​

2019/03 to 2022/04 (3yr) Contract Reliability Analyst, Husky Energy, Calgary, AB.

​​

  • Created the Superior Refinery (Wisconsin) SAP master data equipment configuration (Hierarchy) draft SAP load sheets in preparation for instrument index revisions for process units including:

  • HF Alkylation, Asphalt, Benzene, Benzout, Crude Unit, Crude Vacuum, Distillate Unifier, Fluid Catalytic Cracker (FCCU), Gas Concentration, Hydrobon, Isomerization, Laboratory, Liquid Propane & Butane, Oil Recovery, Plant General, Platformer, Polymer, Product Storage & Loading, Shipping Terminals, Sulphur Recovery, Tail Gas, Tank Farm, Waster Water Treatment.

  • Developed Electrical System Hierarchy from Substations to Motor Control Centres (MCC's) Switchgear Buckets for all electrical devices.

​ 

2016/08 to 2017/03 (8m) Contract Maintenance Planner Scheduler, PennWest Exploration, Fort St. John, BC.

 

  • Area of Responsibility: Fort St. John, BC & all points north, Peace River, AB. & all points north.​

  • Daily planning and scheduling of Mechanical, Instrumentation, Controls, Electrical, Measurement work for contractors (Maximo).

  • Tangent Oil Battery / Gas Plant Turnaround Planning and Scheduling.

  • Input and implement approved Management of Change (MOC) facility change requests.

 

2011/04 to 2016/06 (5yr) Contract Reliability Analyst, Cenovus Energy Inc., Calgary, AB.
 

  • Develop Asset Maintenance Strategy Documents including predictive and preventive maintenance programs for upstream oil & gas assets for SAGD and Conventional Oil and Gas Facilities (Maximo).

  • Developed Corporate Standard for PM and Job Plan Naming Conventions.

  • Prepared maintenance program data for CMMS conversion of JD Edwards to Maximo (Go Live 2012/12).

 

2005/12 to 2011/03 (5yr) Contract Maintenance Planner, Alliance Pipeline, Calgary, AB.
 

  • Develop database data for Meridium Pressure Vessel Software Implementation

  • Preventive Maintenance Program Development (SAP PM), review P&ID’s for new facilities, create load sheets for Functional Location and equipment Master Data. 

  • Cendec to SAP-ECC6 CMMS Conversion, developed load sheets, functional location and equipment hierarchy structure and naming convention, complete with Standards and Guidelines Manual.

 

2005/08 to 2005/11 (4m) Consultant TransAlta Utilities / Thermal Power Generation, Edmonton, AB

​

  • Applied Kraftwerk-Kennzeichen-System (KKS) coding to new and existing Functional Locations for SAP 4.6C as per equipment tags on P&ID’S

​

2001/06 to 2005/04 (4yr) Contract Technical Lead, Bill of Materials Project, TransCanada Pipelines, Calgary, AB
 

  • Created Bill of Materials Business Case Decision Summary and Project Cost Benefit Analysis

  • Re-engineered SAP to BOM Database materials management process for just in time delivery

  • Developed user and training manuals, trained the trainers.

  • Developed 670 new Bill of Materials for Inspections and Overhauls

  • Bill of Materials (BOM) Database administration.

 

2000/11 to 2001/06 (8m) Contract Turnaround Project Manager, Delta Catalytic Industrial Services / B.P. Central Alberta Midstream / Whitecourt, Alberta (Windfall Sour Gas Plant)

​

  • Managing (Catalytic) planners, schedulers, cost control personnel with the development of turnaround work packages and scheduling through to plant startup.

 

2000/04 to 2000/11 (8m) Owner, Developing Failure Modes Effects Analysis Tool (FMEA), Sultan Maintenance Planning Corp.

​

  • Developing Failure Modes Effects Analysis Tool (FMEA)

 

1999/07 to 2000/03 (9m) Contract Senior Mechanical Maintenance Planner, SAP-PM to Avantis CMMS Conversion, TransCanada Pipelines, Calgary

​

  • Created asset & equipment integrity plans, inspection procedures and bill of materials for rotating and reciprocating equipment based on the Nova-TransCanada former maintenance programs.

  • Compiled gas compressor magnetic bearing drawings, parts lists and documentation.

  • Converted 1430 Gas Compressor aerodynamic assembly drawings & parts lists into Panagon IDM (FileNet software).

 

1997/06 to 1999/04 (2yr) Contract Mechanical Stream Leader SAP-PM CMMS Implementation, Nova Gas Transmission, Calgary 

​

  • Performed hands on SAP-PM (2.2 & 3.1H) Plant Maintenance Module Implementation,

  • Managed & coached a team of (4-6) data entry people and (1) mechanic

  • Implemented 2400 preventive / corrective mechanical procedures, automating planning and scheduling, with 600 new parts lists.

  • Converted preventive maintenance tasks to MS Word in preparation for SAP-PM implementation.

  • Created new parts lists for all Solar Gas Turbines Compressor Packages inspection procedures.

 

1996/02 to 1997/05 (1yr) Expatriate Senior Maintenance Planner, Zueitina Oil Company Tripoli, Libya

​

  • Zueitina Terminal (Ajdabiya) - LPG Plant, Oil Terminal & Marine Port, - Rotation Schedule - 43/38 days

  • Marine Port Oil Terminal, LPG Gas Plant, Camp, Power generation, Tug Boat, daily planning and scheduling.

  • LPG Gas Plant Turnaround planning and scheduling.

 

1988/09 to 1995/08 (7yr) Senior Mechanical Planner, Technologist 5, Nova Gas Transmission Limited, Edmonton/Calgary

​

  • Created and documented all Coberra 6000 (Rolls Royce RB211) Compressor Packages - Fuel and Start Gas System mechanical inspection procedures using Reliability Centered Maintenance (RCM) and Failure Modes Effects Analysis (FMEA) training.

  • Solar Turbines compressor fleet maintenance management, planning & scheduling, annual fleet budgeting.

  • Performed CMMS implementation of Maintenance Control Program I to MCP II.

 

1986/09 to 1988/09 (2yr) Maintenance Planner, Refining, Husky Oil Operations Limited, Lloydminster, AB

.

  • Daily planning and scheduling, Turnaround planning and scheduling.

  • Supervisory duties during times of absence of the supervisor or foreman. 

  • Warehouse coordinator duties (6 months)

 

1980/07 to 1986/09 (6yr) Interprovincial Red Seal Journeyman Millwright, Refining, Husky Oil Operations Limited, Lloydminster, AB

​

  • Compressor and conveyor maintenance, pump repair, alignments, mechanical seal replacement and failure analysis, forklift service and overhaul.

 

 

Education
 

  • Primavera P6 Professional Fundamentals Rel 15 Ed1, NAIT, 2017
     

  • Red Seal Interprovincial Millwright, Alberta Journeyman, NAIT
     

  • Pre-employment Industrial Mechanic - Millwright,  SIAST
     

  • Grade 12 Graduate, Maryfield High School